Language version

East-Africa

13 Killed, Over 15,000 Left Homeless By Flash Floods In Southern Tanzania

Advertisement

Published

on

At least 13 people have been killed and 15,096 others have been left homeless by flash floods that swept 16 villages in Tanzania’s southern district of Kilwa in Lindi region, an official said on Saturday.

Christopher Ngubiagai, Kilwa district commissioner, said the floods caused by ongoing torrential rains also damaged tens of hundreds of hectares of farmland and killed livestock.

“The floods that occurred from Jan. 26 have left people in the 16 villages in devastating shock,” he told Xinhua in a telephone interview, adding that the district authorities have created four centers that were sheltering 8,000 people who have been made homeless.

Ngubiagai said the remaining 7,096 people were being accommodated by their relatives and friends. Kilwa district has a total of 90 villages, he added.

The official appealed to individuals, businessmen and organizations to donate relief supplies, including food, water, medicines, tents, blankets, mattresses and clothing to the victims.

He said the Kilwa district authorities were now counting the loss in the 16 villages to establish the exact number of houses that have been demolished by the floods, the number of destroyed hectares of farms, the number of killed livestock and damage on the infrastructure, including schools, dispensaries and roads.

Reports from northwest district of Magu in Mwanza region said 152 people were left homeless after 89 houses were demolished by floods on Friday.

Safia Jongo, Mwanza region acting police commander said all the victims were rescued and moved to safer areas.

On Sunday, the Tanzania Meteorological Authority issued its latest weather outlook warning of looming heavy rains in more than 10 regions across the east African country.

Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

East-Africa

Uganda Airforce strikes ADF Bases in DRC

Published

on

Allied Democratic Front ADF rebels have suffered aerial bombardment and artillery fire power from Uganda and Congolese forces, local media in DRC said.

“This morning, we launched joint air and artillery strikes against ADF camps with our Congolese allies,” the Ugandan army said.

 However, Patrick Muyaya the Congolese Government spokesman has denied presence of Ugandan troops on DRC territory. “the Ugandan army is not on Congolese soil.”

 Yet the spokesperson of the Ugandan army said Tuesday, November 30 that the armed forces of their country have launched military air operations jointly with the FARDC. He specifies that the two forces “launched air strikes” against the positions of the ADF.

 This intervention comes after President Félix Tshisekedi “granted” the Ugandan army authorization to enter the territory of the DRC to “fight against armed groups, in particular the Ugandan rebels of the ADF”.

 President Tshisekedi is dedicated to restoring order and peace in troubled Eastern region of DRC that has for decades suffered attacks from foreign rebel groups.

 To achieve this objective, Patrick Muyaya warns that “it is within this framework that we work on a regular basis, with the Armies of neighboring countries. we exchange intelligence information on a regular basis.”

 “Today we all face the same threat called Allied Democratic Forces (Adf). You have seen that on November 16, they struck in the middle of Kampala (Ugandan capital) and they strike regularly in the DRC ”, he concludes.

Continue Reading

East-Africa

East African Crude Oil Pipeline Activities Complete-Museveni

Published

on

President Samia Suluhu Hassan of Tanzania and President Yoweri Museveni of Uganda are currently in the Daresalaam for an Oil and Gas Symposium at the Julius Nyerere International Convention Centre.

The symposium which off on Saturday has drawn hundreds of delegates while others are attending virtually owing to covid-19 prevention measures.

On the agenda are discussions on the ongoing activities on the East African Crude Oil Pipeline, as well as other oil and gas projects.

There will also be an emphasis on pushing national participation and promoting local content as a channel to economic development in the two countries.

According to details the construction of this Crude Oil Pipeline will cost U$600million.

“The East African Crude Oil Pipeline (EACOP) project is a good durable business,  it will create jobs for a lot of sectors,” President Museveni said during his presentation.

“I am happy to tell Tanzanians, Ugandans, and the world that the activities on the East African Crude Oil Pipeline (EACOP) are complete,” Museveni said.

According to details the construction phase is expected to generate 14,000 directs jobs, 45,000 indirect jobs by the contractors, and induced employment of another 105,000 people as a result of utilization of other services by the oil and gas sector

Production is expected to reach a plateau of 230,000 barrels per day. That’s higher than the output of Equatorial Guinea and Gabon, two of Africa’s OPEC members.

In April, President Samia and President Museveni signed the pipeline deal which both leaders described as victory for the two countries.

Partners will develop the Tilenga and Kingfisher discoveries near Lake Albert in Uganda.

The Ugandan pipeline section covers 296km. This pipeline will transport Uganda’s waxy crude for export at the port of Tanga in Tanzania.

The Tanzanian pipeline section from the border town of Mutukula to Chongoleani terminal in Tanga at the Indian Ocean is 1,443km.

The shareholding structure, as detailed in the Shareholders Agreement, which defines the rights and responsibilities of the shareholders in the pipeline company is; Uganda through Unoc with 15%, Total Holdings International B.V. with 62%, Tanzania through its national oil company, TPDC, with 15%, and Cnooc with 8%.

East Africa Oil Pipeline Construction Date Still Unknown

Continue Reading

East-Africa

EALA Legislators Vote To Amend Election Act

Published

on

The period of electing members of the East African Legislative assembly may be extended from the current 90 days to six months.

MPs of the East African Legislative assembly have overwhelmingly supported a motion that seeks to amend the EALA election act to extend the period in which elections should be conducted.

They want the election to be conducted within six months instead of three.

The MPs say the amendment will allow the National parliament more time to prepare for the election before the expiry of the term.

Tanzania’s representative Adam Kimbisa and Fancy Nkuhi moved the motion.

Continue Reading

Trending